Cat Hill, EN4
Before
![](https://london-construction.co.uk/wp-content/uploads/2018/12/99-Cat-Hill-EN4-1-1024x768.jpg)
After
![](https://london-construction.co.uk/wp-content/uploads/2018/12/99-Cat-Hill-EN4-4-1024x768.jpg)
In Pictures: Start to Finish
Details
Works involved
TBA:
Details TBA.
Architectural Plans
Additional Details
Duration of Project:
TBA
Budget:
Available on request.
![](https://london-construction.co.uk/wp-content/uploads/2017/11/IMG_0106-300x300.jpg)
Malcolm Lane IG8
Malcome Lane IG8 Before After Project in pictures Previous Next Details Works involved TBA: Details TBA. Design Plans Previous Next Additional Details Project duration:TBA Budget: Available on request View More Projects
![](https://london-construction.co.uk/wp-content/uploads/2019/11/thumbnail-4-300x225.jpeg?v=1574966248)
Cat Hill
![](https://london-construction.co.uk/wp-content/uploads/2017/11/8-10-Plastow-300x225.jpg)
Terrace End
Terrace End Before After Start to finish in pictures Previous Next Particulars Works involved TBA: Details TBA. Architectural Drawings Previous Next Additional Details Project duration:TBA Budget: Available on request View
![](https://london-construction.co.uk/wp-content/uploads/2017/11/IMG_2253-300x225.jpg)
1 Rosslyn Avenue
Rosslyn Avenue Before After Start to finish in pictures Previous Next Particulars Works involved Lower floor: Double sided extension, rear extension and basement. Upper Floor:Loft conversion and refurbishment. Architectural plans